It's not as mystical as you seem to think. Simply, for a rope to be an efficacious component of a system that is performing work, the rope must be in tension (pulled on), not pushed on. There is a similar saying among engineers: sh-- doesn't flow uphill.
Jack
- 51
- 1
- 1