Timeline for Allowing an "OR" option between equations in a linear program
Current License: CC BY-SA 4.0
3 events
when toggle format | what | by | license | comment | |
---|---|---|---|---|---|
Jan 6, 2021 at 17:08 | comment | added | Max Alekseyev | Yes, but having $p,q$ allows fine control over which inequalities are satisfied and which are not. E.g., this can be used if one wants to maximize the number of satisfied inequalities. | |
Jan 6, 2021 at 16:48 | comment | added | RobPratt | Or you can omit the $p+q \le 1$ constraint and use only one binary variable, as in my linked answer. | |
Jan 6, 2021 at 5:35 | history | answered | Max Alekseyev | CC BY-SA 4.0 |